1. Plan must include the ______________ systems concept for implementation of the new
Information system.
a) Existing.
b) Future.
c) Omitted.
d) Progressing.
2. ______________ information system uses the information technology to develop all features in the
products.
a) Structure.
b) Strategic.
c) Systematic.
d) Statistical.
3. The following statement which one is true to information systems.
a) Information into data.
b) Procedures into statement
c) Data into information.
d) Statement into procedures.
4. ______________ is media used in network which is used to connect between countries.
a) Satellite.
b) Fibre optics
c) Coaxial.
d) Twisted pair.
5. . ______________ system monitors the processing of jobs, development and schedule in the overall
systems.
a) Testing.
b) Processing.
c) Performance.
d) Scheduling.
6. Information System specialists also called as ______________.
a) user consultant.
b) user friendly.
c) user expert.
d) user manager.
7. The operating decisions resulting actions usually cover ______________ periods.
a) Medium.
b) short time.
c) over an year.
d) long time.
8. ______________ takes responsibility and keeps track of progress in MIS design. Development and
implementation.
a) Time remainder
b) Periods
c) Allocation
d) Scheduling
9. Program testing concept use ______________ approaches
a) Sequence
b) Parallel
c) top-down
d) bottom-up
10. ______________ data is communicated between communication devices in the form of wave
a) guided media
b) Unguided Media
c) Both media
d) None