a) Trail pits
b) Test piles
c) Probing
d) Digging
Answer: c
Explanation: In Probing, a hollow tube of diameter 35 mm to 50 mm is taken. The tube is driven into the ground 300 mm or so at a time. It is then withdrawn and the material caught in the slit is inspected.
Join The Discussion