a) Costlier than line maintenance
b) Greater man power required
c) Requires smaller space
d) More extensive than line maintenance
Answer: c
Explanation: Base maintenance usually demands greater man-hours and it can generally take up to 8 weeks to complete, depending on the aircraft and the number of technicians involved. It also requires the most space of all maintenance checks, and as such must be performed at a suitable maintenance base.
Related Posts
In a nine node quadrilateral, the shape functions can be defined as _______
The gauss points for a triangular region differ from the _____ region.
The nodal temperature load can be evaluated by using _____
In six node triangular element, the gauss points of a triangular element can be defined by ____
Six node triangular elements is also known as _____
N1, is of the form ____
A _________ element by using nine-node shape function.
Join The Discussion