a) 40
b) 400
c) 4000
d) 40000
Answer: d
Explanation: A D-check is also referred to as Heavy Maintenance Visit and it requires the most space of all maintenance checks. Due to the extensive amount of work done in D-checks, it requires up to 40,000 man hours.
Related Posts
For modeling of inclined roller or rigid connections, the method used is ___
In penalty approach evaluate _______ at each support.
The first step of penalty approach is, adding a number C to the diagonal elements of the stiffness matrix. Here C is a __________
If Q1=a1 then a1 is _________
Penalty approach method is easy to implement in a ______
In elimination approach method, extract the displacement vector q from the Q vector. By using ___
In elimination approach, which elements are eliminated from a matrix ____
Join The Discussion