a) It defines tasks required to define resources, timelines, and other project related information
b) It defines a set of negotiation activities at the beginning of each pass around the spiral
c) It defines tasks required to assess both technical and management risks
d) It defines tasks required to construct, test, install, and provide user support
Answer: b
Explanation: Except option “b” all other tasks/activities are present in Spiral Model as well.
Related Posts
The output of the two codes shown below is the same.
i. bin((2**16)-1)
ii. ‘{}’.format(bin((2**16)-1))What will be the output of the following Python code?
hex(255), int(‘FF’, 16), 0xFFThe formatting method {1:<10} represents the ___________ positional argument, _________ justified in a 10 character wide field.
What will be the output of the following Python code?
l=list(‘HELLO’)
p=l[0], l[-1], l[1:3]
‘a={0}, b={1}, c={2}’.format(*p)What will be the output of the following Python code?
l=list(‘HELLO’)
‘first={0[0]}, third={0[2]}’.format(l)The output of the two codes shown below is the same.
i. ‘{0:.2f}’.format(1/3.0)
ii. ‘%.2f’%(1/3.0)What will be the output of the following Python code?
‘%x %d’ %(255, 255)
Join The Discussion